Tuesday, 26 April 2016

Adaptation B - Completed Rigging

video 

A set of complete tank treads courtesy of Alan's formula which took a little bit of reverse engineering and patience to get right after a few attempts. I download a script to enable me to attach the joints to the NURBS curve then applied an IK Handle to make it seem like the joints move around the curve.

video
The fully rigged arm, this was very difficult intitially but eventually I settled for just using joints and controls to make a simple arm rig.

The rigging part of the project wasn't easy, I haven't done much rigging so it took a while to get right but I am happy with the results.

1 comment:

  1. Those treads are neat. Can't imagine how tricky it must have been to get right.

    ReplyDelete